Proposal portal · 4RacingProgramme period · 01 Jul 2026 – 30 Jun 2027 · 12 months
The Link South Africa
Portal preview · Sample data shown. This is what 4Racing's authorised users will see in the live client portal once the contract is signed.
Client Portal · Module 6
Document Vault
Secure, versioned repository for every diagnostic, plan, report and signed deliverable. Role-based access for 4Racing, The Link and individual beneficiaries.
| Document | Type | Owner | Date |
|---|---|---|---|
| Inception Plan — template | The Link | Issued on signature | |
| Diagnostic Report — Thabisong (template) | The Link | Due 31 Jul 2026 | |
| Diagnostic Report — Sipho Esihle (template) | The Link | Due 31 Jul 2026 | |
| Diagnostic Report — MaThando (template) | The Link | Due 07 Aug 2026 | |
| Diagnostic Report — Pink Sprinkles (template) | The Link | Due 07 Aug 2026 | |
| Incubation Plans (×4) | PDF bundle | The Link | Due 21 Aug 2026 |
| Monthly Progress Report — July 2026 | The Link | Due 05 Aug 2026 |